proyectos:inta-obj
| <fc #800080>Objectives Summary</fc> | ||
|---|---|---|
| # | Brief Description | Period |
| 1 | Development of accurate gap-filling method for PLATO2.0 | M01-M36 |
| 1.1 | Analysis of PLATO2.0 pipeline | M01-M12 |
| 1.2 | Adaptation of OleMIARMA software to PLATO2.0 pipeline | M12-M36 |
| 2 | Other interesting stuff | M12-M24 |
| 3 | More stuff to be done | M12-M24 |
Objective #1 Development of accurate gap-filling method for PLATO2.0
Here we write more in detail the description of the objective and everything we consider important.
Objective #2 Other interesting stuff
Here we write more in detail the description of the objective and everything we consider important.
Objective #3 More stuff to be done
Here we write more in detail the description of the objective and everything we consider important.
proyectos/inta-obj.txt · Last modified: 2015/06/08 15:46 by 127.0.0.1