Próximos eventos y fechas de entrega

1 Junio 10h Teleconferencia Reunión TAS, IAA, Phillippe respecto los diseños propuestos del IAA-TAS. Para entregar a SRR
Isidro, Pedro Rodriguez y Raúl.

Juanma, Bea, Julio, Rosario, JC

Phillipe.

PLATO MEU Design options Technical note_ Issue1_1

minutas: PLATO-UGRIAA-TAS-LESIA-002MoM_06012015.docx
PM#415July (13h)-17 July (16h)
DLR, Berlin

- From Wednesday, 15.07.2015 13:00 until Thursday 16.07.2015 13:00 we will organize Splinters to prepare the PM meeting with ESA

- From Thursday, 16.07.2015 14:00 until Friday 17.07.2015 ~16:00 will be the official PM#4, together with representatives from ESA, CNES and DLR Agency.
Julio 2015
Actualizar los WPDs para B2/C/D. Ver PLATO-MIMG_MS_24-CNES
31Julioprimera interacion con los documentos de SRR
7Septiembre
entrega DEFINITIVA de documentos SRR

The SRR Data Package consists of
 Updated PDCR Document
Incorporate all resulting AIs, Board Report issues, recommendations, RID
panel dispositions
 Additional Documents, not requested or available for the PCDR
All Docs mentioned in the DRL [AD7] have to be provided
Please check:
PLATO Payload Document Requirements List (P/L DRL)
Tailored Document lists circulated for the PDCR
18 Nov
Delivery of SRR Data Package to ESA

SRR colocation
KO23 Feb 2016MunichKick-Off Phase B2
PM#5Feb 2016MunichESA,P/L Consortium